QUALITY PROJECTS

 

More features,
lower price

 
   

Free trial

Buy

Tour

Reviews

More products & services

Contacts

 
                       


ChangeAide
is
all the software you
need to produce
and monitor your
Project Plans

 

Easy to use
intuitive interface

 

 

Are you a PRINCE2® user looking for real support?


Are you finding it difficult to get the benefits of
Product Based Planning (PBP)?

In the real world of projects

  • keeping track of a developing and changing product based plan
  • ensuring consistency between the various elements
  • moving seamlessly into the domain of activities, resources and scheduling

is (at the least) challenging without some software support - to record and check the outputs from your planning workshops, and to help create the necessary documentation for interested parties.

To make a real difference, you need a tool that "understands the rules" of PBP, is intuitive to use and guides you gently in the right direction. And, when you are ready to move into the realm of MS Project, offers a straightforward interface that preserves the dependencies that you carefully built into the PFD.

Then you need ChangeAide (previously known as P2WORLD)

Software Product Description

ChangeAide Release 3.0 is a software tool designed to assist project managers using the "product-based planning" technique defined as part of the PRINCE2® Project Management Method. In addition, ChangeAide integrates a number of additional concepts from Managing Successful Programmes (MSP)™. This software also supports other project management processes such as the Project Management Institute - Project Management Body of Knowledge (PMBoK) and Atern (formerly DSDM).

For further information about the product, please visit the online help for ChangeAide.

Features

ChangeAide has an intuitive graphical user interface, which uses interactive diagrams and tables to assist in the following activities:

  • Producing a complete Product Breakdown Structure (PBS) diagram; (Also known as a Work Breakdown Structure (WBS).
  • Producing Product Descriptions for each Product on the PBS;
  • Producing a Product Flow Diagram (PFD) for the products identified on the PBS;
  • Preparing Project Activities to structure the work to complete all of the products;
  • Establishing and maintaining a Project Log;
  • Producing Product Description Reports and Project Activity Reports in various formats.
  • Exporting documents in various formats, including Printer only, DHTML, PDF, Excel, Word.
  • Producing stage PBSs and PFDs as the project progresses.

Benefits

  • Reduces the amount of project manager time needed to create and maintain consistent Product Based Plans.
  • Creates a single unified document per project, containing synchronised versions of most of the diagrammatic and textual project documents required in the Planning (PL) process within PRINCE2®.
  • Provides interactive tracking of all these project documents and the relationships between them.
  • Includes help files and integrated tutorials to show how to use the toolset.
  • Provides example projects to demonstrate an integrated view of a Product Based Plan.
  • Provides valuable support in learning and applying the underlying PRINCE2® methods.
  • Eases the creation of plans for Microsoft Project.
  • Provides a Visual Status mechanism to highlight incomplete products in ongoing projects.

Product Environment

  • ChangeAide can be installed on windows based PCs running Windows XP or later.
  • ChangeAide exports and imports relevant Microsoft Project plan information.
  • ChangeAide is available in English (full support) and Dutch (partial support).
 

Three Versions

Product Version provides support for managing a set of products for a programme or project. This list of products is described using the Product Checklist, the Product Breakdown Structure (PBS), the Product Description for each product, the Product Flow Diagram (PFD).

Planning Version includes all of the capabilities of the Product Version and includes the capabilities to identify and manage the activities to produce the products and interact with MS Project.

Project Version provides support to a project manager to plan and manage a single project. Additional support is provided to capture and manage Project Records, to create and maintain word processor templates for documents and reports and provide more detailed project organisation structure information.

Reader Version, free of charge and enables users to read and print plans produced by Other Versions

Typical usage might be:
Work Package: one copy of Product version, possibly one copy of Reader version
Small project: one copy of Planning version, possibly several copies of Reader version
Medium project: multiple copies of Planning version, several copies of Reader version
Large project: one copy of Project version, multiple copies of Planning version, multiple copies of Reader version
Mutli-project: several copies of Project version, multiple copies of Planning version, multiple copies of Reader version

 

What can I do with ChangeAide?

 

What's new in ChangeAide?

 

 
PBP is a powerful communication tool between all project stakeholders throughout the project lifecycle. You can gain the benefits of PBP irrespective of whether you use other components or processes of PRINCE2®. With PBP you can more precisely control the scope of your project; focus only what is really needed to meet the business case! PBP underpins quality control in your projects; team members, teams, sub-contractors know exactly what is expected of them - before they start work!

 

Privacy Policy

© Quality Projects (Consulting) Limited 2007, 2008, 2009

top